DETERMINISTIC XER-TO-XER ASSURANCE · EDITABLE EXECUTIVE REPORT

XER Period-End Narrative

Combined IMS movement and director control position

ScopeNorthstar Civils + Northstar SystemsPrevious data date23 Jul 26Current data date20 Aug 26Prepared byXERR demonstration
PERIOD-END CONTROL POSITION

Transparent programme position

Statements below use only the selected XER scope. External evidence is visibly separated and never inferred.

XER-DERIVED

What decision-makers need to know

6 findings
  1. 1

    Integrated finish moved 7 days later between the selected extracts.

    Source: XER comparison
  2. 2

    12 activities matched deterministically; 1 is new and 0 are reported as removed without assuming supersession.

    Source: XER comparison
  3. 3

    8 activities exceeded the 3-day deterioration threshold; 0 improved by the same threshold.

    Source: XER comparison
  4. 4

    Negative-float activities changed from 0 to 5.

    Source: XER comparison
  5. 5

    Logic checks identify 0 missing-predecessor and 0 missing-successor activities in the current selected scope.

    Source: XER comparison
  6. 6

    Largest evidenced finish deterioration: CV-A300 · Foundation construction (14 days).

    Source: XER comparison
CONTROL DECISIONS

Director decisions required

4 decisions
Decision 1

Confirm recovery ownership for the 7-day integrated finish deterioration.

Evidence-linked recommendation
Decision 2

Require evidence-backed treatment for 5 current negative-float activities.

Evidence-linked recommendation
Decision 3

Review and accept 3 activities with predecessor-logic movement.

Evidence-linked recommendation
Decision 4

Accept the deterministic Project + Activity ID comparison boundary.

Evidence-linked recommendation
FINISH MOVEMENT PROFILE

Largest evidenced movements

Days vs previous
Earlier forecastPrevious positionLater forecast
Previous forecastRecovered earlierMoved laterScale ±14 days
SUPPLEMENTARY EVIDENCE

Facts the XER cannot contain

Editable
Interface / dependency position

Awaiting evidence — not contained in the XER files.

AMBER · Not used in the calculated RAG
Land, consent and access

Awaiting evidence — not contained in the XER files.

AMBER · Not used in the calculated RAG
Integrator findings

Awaiting evidence — not contained in the XER files.

AMBER · Not used in the calculated RAG
Client decisions / approvals

Awaiting evidence — not contained in the XER files.

AMBER · Not used in the calculated RAG
SUPPLEMENTARY READINESS0 / 4Manual evidence still required

Source basis: Previous XER data date 23 Jul 26; current XER data date 20 Aug 26. Scope: Northstar Civils, Northstar Systems. Dates, status, float, constraints, calendars and TASKPRED logic only.