GridPulse
Read the substation position. Open the activity behind it.
Find the pressure. Follow the evidence.
How much recovery room is left?
What slipped, and what moved this month?
What changed in the exported population?
Every category. Every live branch.
Expand each package. Select a RAG cell to see its activities and live finish dates.
Follow the actual WBS structure.
| WBS Branch | Count | Open | Complete | Live Finish | Worst BL Δ Days | Worst PM Δ Days | Health | Evidence |
|---|
What is due over the next eight weeks?
This is the live finish profile, separate from the stage-comparison matrix.
A number means activities finish in that seven-day window. Colour shows the worst condition among those activities. Empty means no scheduled finishes, not green health. Select a cell for evidence.
Plan on a Page.
Selected programmes can be viewed together here. These records stay separate from asset-health counts.
Live XER. Project baseline. Previous month.
Fictional demo sources are ready to explore. Licensed project workspaces start blank and accept your own XER files.
| Role | Project / File | Programme / Partner | Data Date | Owner Activities | Linked Rows Excluded |
|---|
See changes before accepting the picture.
Category Profile
Categories are driven by the reference and live WBS, rather than eight fixed stages. Upload a profile for OHL or Underground Cables when ready. Use Parent Row to preserve category nesting. This changes the reference scope and matrix; live dates always come from XER.
Main PDF package and WBS reference
The printed reference uses its own P6 filter. Live counts below use the displayed GridPulse filters. A difference is flagged for review and never forced to match. Repeated WBS labels remain ambiguous rather than selecting a branch by count.
| PDF Row | Package / WBS Label | PDF Count | Live Candidate Count | Difference | Check |
|---|
Reference Document
Update backup WBS counts.
For a later PDF extract, paste its WBS names or IDs and activity counts using the CSV header below. These records check counts only. They never replace live dates.
| Project | WBS | Expected | Raw Live | Δ | Result |
|---|
Review WBS scope mapping.
GGP Package (Asset Type) is used where available, with named substation WBS branches as a fallback. A user rule can include another WBS branch and its descendants. OHL and UGC health views can be configured with their own reference later.
| Project | WBS ID | Package |
|---|
| Activity | Programme / Partner | Stage | Health | Live Finish | BL Finish | BL Δ Cal Days | Previous Finish | PM Δ Cal Days | TF Working Days |
|---|