Bespoke programme intelligence

Turn a 25,000-activity programme into a decision system.

The XERR DSM Decision Engine combines multiple schedules into one dependency model, reveals where packages truly rely on each other and gives management a traceable route from an executive signal to the exact activity evidence.

ONE IMS across uploaded projectsSESSION ONLY source programme unchangedTRACEABLE from signal to activity
LIVE CAPABILITYDSM MATRIX
Full activity dependency structure matrix in the XERR DSM Decision Engine
01See every recorded dependency in one navigable structure.

The management problem

A schedule can be technically connected and still be impossible to govern.

Conventional schedule reports count activities and milestones. They rarely show which package is feeding another, where work is running against the intended sequence, which dependency block is driving exposure or whether the evidence is strong enough to defend the conclusion.

This engine turns the network into a navigable control model—built around the programme, the WBS and the decisions leaders must make.

01

One integrated model

Analyse multiple uploaded programmes as one IMS so project-to-project dependencies remain visible.

02

Structure before symptoms

Find dense dependency blocks, feedback loops and cross-package pressure before they become meeting surprises.

03

Evidence to exact activity

Move from an executive signal through its package and WBS route to the activities, dates, float and constraints behind it.

04

Control action, not decoration

Convert findings into coordination periods, action registers, change traces and management-ready evidence.

Built for the real control room

From imported schedules to a defendable management conversation.

The software does not replace the planning engine. It makes the imported logic understandable, challengeable and actionable across project and organisational boundaries.

  • Full activity DSM with forward, feedback and off-diagonal interface blocks
  • Clickable package and WBS dependency wheel with provider and receiver isolation
  • Recursive dependency blocks that expand to the controlling activities
  • Critical-route, predecessor, successor and change-impact tracing
  • Time-phased coordination pressure and interface action evidence
  • Source-evidence audit and configurable DCMA-style schedule analysis
01Combine

Load the programme files and preserve cross-project relationships in one IMS model.

02Expose

See blocks, interfaces, feedback logic, evidence gaps and decision pressure.

03Trace

Open the route through package, WBS and exact activity evidence.

04Act

Assign owners, evidence and checkpoints around the finding that matters.

XERR

Bespoke XERR software

Your control problem should shape the software—not the other way round.

XERR can adapt the data model, terminology, thresholds, workflow, branding and evidence outputs around your programme controls process.
Discuss the problem