Logic
Missing predecessors and successors, relationship integrity, leads, lags and task dependent zero day links.
XERR DCMA Schedule Assurance
Upload a Primavera P6 XER file from any project or industry, control the analysis population and trace every reported metric to the activities that produced it.
Focused schedule assurance
Diagnostic thresholds change the RAG classification only. They do not alter the activities found, the formula or the denominator, so the technical result remains separate from the organisation’s tolerance.
Missing predecessors and successors, relationship integrity, leads, lags and task dependent zero day links.
High float, negative float, long duration, invalid dates, items on the data date and missed work.
Hard and soft constraints, resources, calendars, open project boundary logic and selected population scope.
Affected activity drill down, search, multi value filtering, numerator and denominator, methodology and print/export.
Controlled demonstration
Visitor access is read only. Imports, editing, assignment, exports and advanced controls remain protected.
Calculation assurance
Population declared: selected XER files, project networks and eligible activities are shown before interpretation.
Boundary aware: internal logic is assessed within its P6 project while external links remain visible as project boundary evidence.
Precision controls: thresholds can be adjusted by slider or exact numeric entry without changing the finding engine.
Commercial outputs: filtered activity evidence can be searched, printed and used to focus a corrective review.
14 day named user evaluation